Written by the Al Jory Marble team. We fabricate and install in our own shop at 4711 135th St in Crestwood, IL, serving Chicago and the suburbs. See our site at aljorymarble.com.
This is the question we get more than any other, and the honest answer has two parts.
The install itself is fast. A typical residential kitchen is set in a single day, and often in a matter of hours.
The project around it is not. From the day you sign to the day you have a working kitchen, most jobs run a couple of weeks, and the reason has almost nothing to do with how long it takes to carry stone into a house.
Here is the whole sequence, what each stage actually involves, and where the delays really come from.
Stage 1: Consultation and Written Estimate
We walk your kitchen or bath, talk through layout, edge profiles, sink cutouts, overhangs, and budget, and give you a written estimate at no charge. If a showroom visit is easier, come to Crestwood. If not, we bring samples to you.
What moves this stage: how quickly you can decide on material. Some homeowners pick in one visit. Others take three weeks comparing quartz against quartzite, which is entirely reasonable and entirely up to you. Our kitchen countertop buying guide and our quartz vs granite vs quartzite comparison exist to shorten this part.
What we need from you: nothing yet, beyond access to the space.
Stage 2: Slab Selection
You pick your actual stone. Not a sample chip, the slab.
This matters more with natural stone than people expect. Granite, quartzite, and marble move dramatically across a single piece, and a two inch sample cannot show you veining, movement, or color shift. Come walk the racks at Crestwood and see full slabs end to end. Bring a cabinet door and a flooring sample and hold them against the stone.
Because we stock marble, quartz, granite, and quartzite on site, most projects start without waiting on a supplier order. That is one of the bigger timeline advantages of buying from a fabricator with its own inventory rather than a shop that orders everything in.
What can add time here: a special order color that is not in our building. If you want something we do not stock, we will tell you what the lead time looks like before you commit.
Stage 3: Templating
This is the stage most homeowners underestimate, and it is the true starting gun for the whole project.
Templating means we come out and capture the exact dimensions of your space: wall variations, out of square corners, appliance clearances, sink and cooktop positions, overhang depths. Walls are never perfectly straight, and stone does not flex to hide it. The template is what makes the finished top fit tightly instead of leaving a gap you can see from across the room.
Templating usually takes one to two hours for a residential kitchen.
Here is the part that causes most delays. We cannot template until the space is ready, and ready means:
- Cabinets are installed, level, and secured. Not delivered. Installed. Templating over cabinets that will shift later guarantees a fit problem.
- The sink is on site. We need the actual sink to cut the actual cutout, especially for an undermount. A model number is not enough, because manufacturers change dimensions between production runs.
- The cooktop is on site if you have one, for the same reason.
- The faucet is on site if it needs holes drilled in the stone.
- Old countertops are removed or scheduled for removal, depending on the job.
If you are in a full remodel, this is where the schedule usually slips, and it is almost never the countertop shop’s doing. Cabinets run late, the sink is backordered, or the plumber has not been out yet. Order your sink and faucet early. That single habit prevents more countertop delays than anything else we can tell you.
Stage 4: Fabrication in Our Shop
Your slab is cut, edged, and polished at our Crestwood facility. Nothing is subcontracted out.
Fabrication involves laying out your pieces on the slab, which for natural stone means deciding how the veining runs and where seams will fall. It involves cutting the sink and cooktop openings, running the edge profile you chose, polishing, and doing a dry fit check in the shop before anything goes on a truck.
Typical fabrication time for a residential kitchen runs several business days. It is longer when the job includes mitered edges, a waterfall island, book matched veining, or unusual cutouts, because those are hand intensive and cannot be rushed without showing.
Because we do this in house rather than sending your slab to a third party shop, there is no handoff sitting in someone else’s queue. That is a real timeline difference, and it is one of the main reasons we fabricate ourselves. Our custom fabrication page covers what happens in the shop.
What moves this stage: complexity, not size. A large simple kitchen can move faster than a small kitchen with a mitered waterfall and three cutouts.
Stage 5: Installation Day
Our crew removes old tops if that is part of the scope, sets the new ones, seams them, secures everything, handles the sink and cooktop cutouts, cleans up, and walks the finished job with you before leaving.
Most residential kitchens are installed in one day. A straightforward vanity may take a couple of hours. A large kitchen with an island, a waterfall, and multiple seams takes longer but still typically completes within the day.
Things to know about install day:
Clear the counters and the path. We need a route from the door to the kitchen wide enough to carry stone.
Plumbing comes after. Sink and faucet reconnection is a plumber’s job, and it happens after the stone is set. Most seam adhesives want time to cure before the sink is loaded up, so plan on the kitchen being out of service until the following day.
Seams are visible. They are not invisible, in any material, from any fabricator. A good seam is tight, level, and color matched, and it is placed where it disrupts the layout least. We explain the whole thing in our post on where countertop seams go.
Backsplash and paint come after. Tear out and installation can nick drywall. If you are painting, paint after.
So What Is the Real Total?
For a straightforward residential job where the space is ready and the material is in stock, most homeowners are looking at a couple of weeks from template to install. Simple vanity projects can move faster. Full remodels take longer because the countertop schedule is chained to the cabinet schedule.
We would rather give you an accurate date than an optimistic one. When you call, we will tell you our current shop schedule honestly, because a date we can actually hit is worth more to you than a date that sounds good on the phone.
The Delays That Are Genuinely Avoidable
After ten years of this, the pattern is consistent. Projects slip for these reasons:
- The sink was not ordered early. Order it before you need it.
- Cabinets were not fully installed at template time. One day of waiting here saves a week later.
- Material was picked late. Selection is the one stage entirely within your control.
- The scope changed after templating. Adding an overhang or moving a sink after the template means re-templating.
- Nobody scheduled the plumber. Book them for the day after install.
Ready to Start the Clock?
The fastest way to a firm timeline is a free measurement and a written estimate. We will tell you what we have in stock, what your space needs before templating, and what our shop schedule looks like right now.
We fabricate and install across Chicago, Orland Park, Tinley Park, Oak Lawn, Naperville, Downers Grove, Joliet, and the surrounding suburbs, handling kitchen countertops, bathroom vanity tops, and commercial countertops. If you are replacing existing tops, see our countertop replacement page, and for new work see countertop installation.
Visit the showroom at 4711 135th St, Crestwood IL 60418, Monday through Saturday, 9:00 a.m. to 6:00 p.m. Call (708) 362-7674 or request a free estimate and we will come measure at no charge.
Serving Chicago & Surrounding Areas
Get Your Free Kitchen Countertop Estimate
Fill out the form and our team will get back to you in next 24 hours.